Multi-Agent-Based Production Planning and Control
Multi-Agent-Based Production Planning and Control
Click to enlarge
Author(s): Zhang, Jie
ISBN No.: 9781118890066
Pages: 440
Year: 201708
Format: Trade Cloth (Hard Cover)
Price: $ 263.51
Dispatch delay: Dispatched between 7 to 15 days
Status: Available

Preface xiii About this book xv 1 Agent Technology in Modern Manufacturing 1 1.1 Introduction 1 1.2 Agent and MultiÂ]Agent System 1 1.3 Agent Technologies in Manufacturing Systems 7 1.4 Book Organization 11 References 14 2 The Technical Foundation of a MultiÂ-Agent System 21 2.1 Introduction 21 2.2 The Structure of an Agent 21 2.3 The Structure of a MultiÂ-Agent System 29 2.


4 Modeling Methods of a MultiÂ-gent System 34 2.5 The Communication and Interaction Model of a MultiÂ-Agent System 37 2.6 The Communication Protocol for a MultiÂ-Agent System 39 2.7 The Interaction Protocol for a MultiÂ-Agent System 43 2.8 Conclusion 50 References 50 3 MultiÂ-AgentÂ-Based Production Planning and Control 55 3.1 Introduction 55 3.2 Manufacturing Systems 56 3.3 Production Planning and Control 61 3.


4 MultiÂ-AgentÂ-Based PushÂ-Pull Production Planning and Control System (MAP4CS) 71 3.4.1 Mapping Methods 72 3.5 Conclusion 90 References 91 4 MultiÂ-AgentÂ-Based Production Planning for Distributed Manufacturing Systems 95 4.1 Introduction 95 4.2 Production Planning for Distributed Manufacturing Systems 96 4.3 MultiÂ-AgentÂ-Based Production Planning in Distributed Manufacturing Systems 106 4.4 Agents in MultiÂ-Agent Production Planning Systems 118 4.


5 Contract Net ProtocolÂ-Based Production Planning Optimization Method 123 4.6 Bid Auction ProtocolÂ-Based Production Planning Optimization Method 133 4.7 Conclusion 139 References 140 5 MultiÂ-AgentÂ-Based Production Scheduling for Job Shop Manufacturing Systems 143 5.1 Introduction 143 5.2 Production Scheduling in Job Shop Manufacturing Systems 144 5.3 MultiÂ-Agent Double Feedback-Based Production Scheduling in Job Shop Manufacturing Systems 153 5.4 Agents in the MultiÂ-Agent Double Feedback-Based Scheduling System 158 5.5 Positive Feedback-Based Production Scheduling in Job Shop Manufacturing Systems 162 5.


6 Negative Feedback-Based Production Rescheduling in Job Shop Manufacturing Systems 177 5.7 Conclusion 188 References 190 6 MultiÂ-AgentÂ-Based Production Scheduling in ReÂ-Entrant Manufacturing Systems 197 6.1 Introduction 197 6.2 Production Scheduling in ReÂ-Entrant Manufacturing Systems 198 6.3 MultiÂ-AgentÂ-Based Hierarchical Adaptive Production Scheduling in ReÂ-Entrant Manufacturing Systems 208 6.4 Agents in a MultiÂ-Agent Hierarchical Adaptive Production Scheduling System 212 6.5 Hierarchical Production Scheduling in ReÂ-Entrant Manufacturing Systems 218 6.6 Adaptive Rescheduling in ReÂ-Entrant Manufacturing Systems 244 6.


7 Conclusion 253 References 258 7 MultiÂ-AgentÂ-Based Production Control 263 7.1 Introduction 263 7.2 MultiÂ-Agent Production Control System 264 7.3 Agents in MultiÂ-Agent Production Control Systems 271 7.4 Technologies and Methods for MultiÂ-Agent Production Control Systems 283 7.5 Conclusion 294 References 295 8 MultiÂ-AgentÂ-Based Material Data Acquisition 297 8.1 Introduction 297 8.2 RFID Technology 297 8.


3 AgentÂ-Based Material Data Acquisition System 306 8.4 Agents in MultiÂ-Agent RFIDÂ-Based Material Data Acquisition Systems 312 8.5 MultiÂ-Agent RFIDÂ-Based Material Data Acquisition Systems 326 8.6 Conclusion 329 References 332 9 MultiÂ-AgentÂ-Based Equipment Data Acquisition 333 9.1 Introduction 333 9.2 Basics of OPC Technology 334 9.3 AgentÂ-Based Equipment Data Acquisition System 340 9.4 Agents in the MultiÂ-Agent OPCÂ-Based Equipment Data Acquisition System 347 9.


5 Implementation of a MultiÂ-Agent OPCÂ-Based System 355 9.6 Conclusion 361 References 361 10 The Prototype of a MultiÂ-AgentÂ-Based Production Planning and Control System 363 10.1 Introduction 363 10.2 Architecture of a Prototype System 363 10.3 Agent Packages and Communication in a Prototype System 366 10.4 The Manufacturing System Simulation in a Prototype System 375 10.5 Software Implementation and Application of a Prototype System 383 10.6 Conclusion 399 References 399 Index 401.



To be able to view the table of contents for this publication then please subscribe by clicking the button below...
To be able to view the full description for this publication then please subscribe by clicking the button below...